World War II
The Churchill first saw combat on 19 August 1942, in the Dieppe Raid, planned to temporarily take control of the French port of Dieppe using a force of only about 6,000 troops, mostly drawn from Canadian units. The operation, codenamed Jubilee, would test the feasibility of opposed landings. Nearly 60 Churchill tanks from the 14th Army Tank Regiment (The Calgary Regiment (Tank)) were allocated to support the infantry and commandos; they would be put ashore by Landing Craft Tank vessels, along with the supporting engineers. Some problems were anticipated and allowed for: waterproofing of the hulls, canvas carpets ("Bobbin") to aid the tanks crossing the short stretch of shingle beach, engineer teams to demolish road blocks and a few of the tanks were fitted with flame-throwers. The tanks, a mix of Mark I with hull howitzers, Mark II (three with flamethrowers) and Mark III (some with Bobbin), were expected to enter the town and reach a nearby airfield before retiring back to the beach to be taken off by the LCTs. Half of the tank force would be held in reserve offshore.
In the event, the German defences were stronger than expected. The beach was chert which included larger stones than the anticipated shingle: according to history professor Hugh Henry, the German defenders had previously considered it impassable to tanks. Only the 30 Churchills in the first two waves of 10 LCTs were landed on the beach under heavy fire: the latter two waves were turned away. One Churchill was trapped in its LCT by shellfire. Of the 29 remaining (eight Mark I/IIs, three Oke flamethrower tanks, and 18 Mark IIIs), two sank en route to shore, and 11 were immobilized on the beach due to a combination of the chert shingle and indirect fire. Only 15 would get off the beach and over the sea wall onto the Dieppe promenade. Although these tanks were effective in engaging the defenders in the town's buildings, their further progress was blocked by concrete defences; the engineer demolition teams – killed or pinned on the beach – had not been able to accompany the tanks. Ten of these Churchills were able to return to the beach once the withdrawal had been signalled but they could not be evacuated. According to Henry, no Churchills were penetrated by German anti-tank fire while still manned. These surviving tank crews fought to cover the withdrawal of the infantry from the beach, and almost all were captured with their vehicles, having exhausted their main gun ammunition. The tank regiment's commanding officer, Lieutenant-Colonel Johnny Andrews, was among those killed in action. Nearly 70% of the Canadians were killed, injured or captured and none of the raid's objectives were met other than the secret raid on the radar station on a headland.
Two Mark II had been sent to North Africa for trials and they were joined by six Mk III Churchills (with the 6 pounder) to form the Special Tank Squadron commanded by Major Norris King. They saw action in the Second Battle of El Alamein in October 1942. This detachment, called "Kingforce", supported the attack of 7th Motor Brigade first with three tanks at Kidney Ridge (where one was hit "repeatedly" by anti-tank gun fire (including "friendly fire" from a British gun) and another took "a lot of punishment"), then the remaining five at Tell-el-Aqqaqir. The Churchills were fired on many times by Italian and German anti-tank guns, but only one was knocked out and partially caught fire. One tank was said to have been hit up to 80 times.
Kingforce, formed to test whether the Churchills could operate in Africa, was considered too slow to participate in the chase after the retreating Axis, sent back to Alexandria and disbanded after El Alamein. This seems unlikely, as firstly the Churchill has the same top speed as the Valentine tanks that the 8th Army did use on this advance and secondly; the tanks would have been loaded onto tank transporters such as the Scammell Pioneer to transport them any strategic distance in a reasonable time, without the fuel consumption and wear and tear of driving tanks hundreds of kilometres. It is more likely that Kingforce was disbanded as the trial was limited only to the battle of El Alemain and when that ended, the six tanks of Kingforce were earmarked to go to a Brigade that was operating Churchill tanks, of which the 8th Army had no such brigades. The 25th Army Tank Brigade of three regiments was sent to Africa, and went into action in February 1943 during the Tunisian campaign. It was followed by 21st Army Tank Brigade.
Churchill tanks took part in containing the German offensive of Operation Ochsenkopf in February – March 1943. At the battle of Steamroller Farm, two Churchill Mk III tanks of 51 RTR got ahead of their squadron. They came across an entire German transport column, which they ambushed and completely shot up before they rejoined. The result was the destruction of two 88 mm, two 75 mm and two 50 mm, four lesser anti-tank guns, 25 wheeled vehicles, two 3-inch mortars, two Panzer III tanks and infliction of nearly 200 casualties.
A Churchill tank in a hull down defensive position made a particular contribution to Allied success. In one encounter, on 21 April 1943, during the start of the Battle of Longstop Hill, a Churchill tank of the 48th Royal Tank Regiment got the better of a German Tiger I heavy tank. A 6 pounder shot from the Churchill lodged between the Tiger's turret and turret ring, jamming the turret and injuring the German crew. They abandoned the Tiger, which was subsequently captured by the British. Known as Tiger 131, this was the first Tiger captured by the Western Allies and was particularly useful for intelligence. Tiger 131 has since been restored to full working condition and is now on display at The Tank Museum in Dorset, UK. As of late 2025, it is the only working Tiger tank in the world.
Churchill tanks were not initially used in the Italian mainland in 1943. There were six regiments with Churchills in Tunisia, these may have been kept out because Montgomery preferred the Sherman or because their 6-pdr guns were not considered suitable for the fighting in Italy. Churchills did land in Italy in April/May 1944 with 75mm gun armed Churchills arriving later.
As the mainstay of the Tank Brigades, which operated in support of the infantry, Churchill units were in operation more often than other tank units.
The Churchill NA75s, Churchill Mark IVs converted to carry the US 75 mm gun, were used in Italy. As the Churchill proved to be a better gun platform than the Sherman, the effective range of the 75 mm was increased.
Churchills saw widespread action in Normandy during the Battle of Hill 112 and Operation Bluecoat, as well as subsequent operations in the Low Countries and into Germany, such as the fighting in the Reichswald during Operation Veritable.
The Churchill was able to cross the muddy ground and force through the forests of the Reichswald; a contemporary report expressed the belief that no other tank could have managed the same conditions.
A single Churchill, possibly a Mk V, was trialled in Burma in 1945. It was operated by the 3rd Dragoon Guards (Carabiniers) from the end of April 1945 for about a month. Although it proved impossible to bring the Churchill into action, on approach marches the tank proved at least the equal to the M3 Lee then in service.
The 254th Indian Tank Brigade returned to India from Burma, arriving at Ahmednagar during July 1945. The brigade immediately began conversion from the Lee to the Churchill, the intention being for the newly equipped brigade to return to operations in October 1945. At the time, it was assumed that the war against Japan would continue and that the new battleground would be Malaya. Although a small number of tanks were delivered, and some training undertaken, the end of the war against Japan meant that the conversion was not completed. At the end of September, the 254th Indian Tank Brigade was reassigned and posted away from Ahmednagar. All the Churchills delivered up to that point were returned to the Ordnance Depot at Kirkee (Khadki) by the end of November–early December 1945. Of the three regiments (battalions) involved, the 3rd Dragoon Guards accompanied the 254th Brigade when posted away while the 149th Regiment Royal Armoured Corps and the 150th Regiment Royal Armoured Corps were eventually disbanded at Ahmednagar on 28 February 1946, the majority of personnel already having been repatriated to the United Kingdom or posted to other units.
The Soviet Union was sent 301 Churchill tanks (45 Mk II, 151 Mk III and 105 Mk IV) as part of the Lend-Lease programme. 43 of them (19 Mk II and 24 Mk III) were lost en route on the Arctic Convoys. Delivery of the first 25 units took place in May 1942, but adoption by the Red Army was delayed because of the 30 that were sent by June 1942, 20 had been lost in shipping.
The Churchill was not very popular in Soviet service. Soviet operators disliked the 2 pdr gun of the Mk II version (also used by Matildas and Valentines shipped to the USSR), and the tank was considered "sufficient" by inspectors, who warned that it was "unrefined" in terms of both design and production and would require constant maintenance in the field. Like Soviet heavy tanks, they were assigned to separate breakthrough tank regiments tasked with infantry support.
Churchills were used at the Siege of Leningrad, as well as in the Battle of Stalingrad (47th and 48th regiments of heavy tanks – 42 Churchills), including during Operation Koltso. In 1943, they were employed during the Battle of Kursk, during which the Soviet 5th Guards Tank Army used Churchills in the Battle of Prokhorovka (15th and 36th regiments of heavy tanks – 42 Churchills), and Churchills became the first Soviet tanks to enter Orel during Operation Kutuzov. They were used in the Fourth Battle of Kharkov and the Second Battle of Kiev as well. Churchills were used in other battles until 1944 (82nd regiment of heavy tanks).
The Churchills were also employed at the Finnish front. They took part in the capture of Viipuri as part of the Vyborg–Petrozavodsk offensive in 1944. The Finnish forces reported having destroyed "three heavy tanks of previously unknown type", which after the war were recognized as Churchill III tanks.
In mid-1944, at the request of Britain's War Office, the Churchill was tested by the Australian Army, along with the M4 Sherman. The results were to be used to determine any modifications required for use in the tropics; Matildas were used as a reference point in the tests at Madang, New Guinea. The Churchill was found to be, overall, superior to the other tanks for jungle warfare. However, only 46 of the 510 Churchills ordered by Australia were delivered by the end of the war.